Supplement Snap helps roofing crews capture hidden damage, generate supplement documentation, export clean PDF reports, and email adjusters — all in minutes.
Typical Roof Claim
$12,000
Hidden Damage Found During Tear-Off
Supplement Approved
+$3,200
Final Claim Value
$15,200
Every documented item is a line item the adjuster can approve. When damage goes undocumented, the money stays on the table.
Product
From roof capture to adjuster-ready report.
Starter
Smith Residence
3 captures
Johnson Property
5 captures
Manage projects, track subscription status, and jump into any job.
New Capture
3 sheets of rotted decking found...
Photograph damage, tag roof areas, and add field notes from the field.
Supplement Snap — Project Report
Smith Residence
742 Evergreen Terrace • Mar 12, 2026
Decking — Front
Rotted OSB discovered along eave edge...
Flashing — Chimney
Step flashing corroded at chimney wall...
Ice & Water — Valley
No I&W shield present in valley...
Generate PDF reports with findings, narratives, and photos for adjusters.
See It In Action
Watch how your crew captures damage and sends a professional supplement report — all from the field.
Rotted decking found
Front slope — eave area
Photo captured from the roof
New Capture
Supplement Snap — AI Draft
During tear-off operations on the front slope, three sheets of rotted OSB decking were discovered along the eave edge. The damage was concealed beneath existing shingles and underlayment. Wood was soft and deteriorated from prolonged moisture exposure, requiring full replacement to maintain structural integrity...
Send Report
To
adjuster@insuranceco.com
Subject
Supplement Request — Smith Residence
Smith-Residence-Report.pdf
3 findings, 4 photos attached
Report sent! Adjuster notified.
1. Snap the damage
Crew photographs hidden damage during tear-off
Trusted by Contractors
“We used to lose supplement money on every tear-off because nobody had time to document it properly. Now my crew snaps photos, adds a voice note, and the report is in the adjuster's inbox before we leave the job site.”
Marcus T.
Owner, 12-man crew
$3,200 recovered on first job
“The AI draft saves my office manager 2 hours per supplement. She used to type everything from scratch — now she just reviews what Supplement Snap generates and hits send.”
David R.
Project Manager
2+ hours saved per supplement
“My guys speak Spanish on the roof. They record a voice note in Spanish, and it shows up in English in the report. That alone was worth the subscription — no more miscommunication between field and office.”
Carlos M.
Restoration Company Owner
Zero lost-in-translation issues
The Difference
Documentation
During tear-off, crews capture the hidden issues that insurance supplements often miss.
Decking rot discovered during tear-off often requires additional sheathing replacement that must be documented for supplements.
Step flashing or counter flashing failures around chimneys and walls require proper documentation for adjuster approval.
Code compliance issues like missing ice and water shield can be documented and added to supplement requests.
Output
Generate clean documentation that can be sent directly to insurance adjusters.
Supplement Snap — Project Report
Property Address: 742 Evergreen Terrace, Springfield
Date of Inspection: March 12, 2026
Findings: 3
Findings
Decking — Front Slope
During tear-off of the front slope, three sheets of rotted OSB decking were discovered along the eave edge. Wood was soft and deteriorated from prolonged moisture exposure. This damage was concealed beneath the existing shingles and underlayment.
Flashing — Chimney
Step flashing along the chimney wall was found to be severely corroded with multiple separation points. Counter flashing seal at the mortar joint had failed, allowing water intrusion behind the flashing system.
Ice & Water Shield — Valley
No ice and water shield membrane was present in the main valley. Current building code requires ice and water shield in all valley areas. Installation is necessary to bring the roof system into compliance.
Supporting Photos
Photo 1 — Decking rot exposure
Photo 2 — Flashing corrosion
Photo 3 — Valley underlayment absence
Summary
3 supplement items documented during tear-off inspection. All findings represent concealed conditions not visible during initial inspection. Documentation and supporting photos are ready for adjuster review and supplement submission.
Generated by Supplement Snap
Insurance-Ready
Track claims from tear-off to approval. Everything adjusters need, organized the way your team works.
Insurance company, claim number, policy, date of loss, and adjuster contact — all attached to every project.
Damage photos are embedded directly in your PDF report. Adjusters see the evidence right next to the narrative.
CSV export maps to real Xactimate line codes with unit pricing. Import directly — no manual entry.
Attach EagleView reports or roof sketches to any project. Everything the adjuster needs in one place.
How It Works
Your crew captures damage on-site. The office gets a professional supplement draft — ready to submit.
During tear-off, your crew photographs each area of damage — decking, flashing, pipe boots, code violations — right from their phone.
Select the damage type and roof area, add a quick field note. Everything is organized by project and saved to the cloud instantly.
One click generates a professional supplement draft, exports a PDF report, and emails it to the adjuster — all from the field.
Results
Every documented item is a line item you can recover. Stop leaving money behind because damage wasn't captured properly.
Photos, tags, voice notes, and AI-generated supplement language — captured in real time during tear-off.
Generate a professional PDF and email it to the adjuster the same day. No more waiting for the office to type it up.
Why Roofers Choose It
Supplement Snap was designed around real roofing supplement workflows. From tear-off inspections to adjuster documentation, every step is built to help crews capture hidden damage and generate clear supplement reports.
Designed to work in the field during real roofing tear-offs.
Pricing
One approved supplement pays for the entire platform.
Free
Try it on your next job
No credit card required
Starter
For solo crews
Then $49/mo
Pro
For teams up to 5
Then $249/mo
FAQ
About 5 minutes. Create an account, start a project, and your crew can begin capturing damage immediately from any phone.
Photos and voice notes are saved on your phone. Once you have signal, everything syncs automatically. You just need a connection to generate the AI supplement draft.
No. Any smartphone with a camera works. Your crew is already carrying everything they need.
Yes. Everything is saved to the cloud by project. Office staff can log in from any device and see all captures, notes, and reports.
Voice notes are automatically translated to English. Your crew speaks in their language, and the system converts it for the supplement report.
One approved supplement typically recovers $1,500–$3,200. The platform pays for itself on the first job.
Try your first project free, or book a demo to see how Supplement Snap helps your crew document damage and recover more supplement revenue.
Learn More
Learn how roofing supplements work, what documentation adjusters expect, and how contractors capture hidden damage during tear-off.
Why supplements get missed and how software helps crews capture findings faster.
Read more →
See what a professional supplement report looks like and what it includes.
Read more →
The step-by-step process from hidden damage discovery to adjuster approval.
Read more →
Common concealed conditions crews find when shingles come off.
Read more →
What documentation adjusters expect and how to capture it during tear-off.
Read more →